Free flowing traffic on Crosstown - WCIV-TV | ABC News 4 - Charleston News, Sports, Weather

Free flowing traffic on Crosstown

Posted: Updated:
(WCIV) (WCIV)

By Tessa Spencer
tspencer@abcnews4.com

CHARLESTON, S. C. (WCIV) -- Commuters on the Septima P. Clark Expressway got a special treat Thursday morning -- an extra lane in both directions.

Two inside lanes that were closed for several months so crews could repair the drainage system are now back open.

Construction will continue on the Crosstown as crews will be replacing drainage pipes. Future additions include a tunnel and a pump station.

While almost all of the work being done is to repair a decades old drainage system, Mayor Joe Riley wants to make sure that residents and visitors alike are pleased with the overall look.

"When it's finished, the neighborhoods and also the motorists will be in a more Charleston-like place."

The esthetic upgrades include palmetto-lined streets, pedestrian cross walks, better lighting and landscaping.

The first phase on construction is slated to be completed this November. 


  • Tessa Spencer

    Email: tspencer@abcnews4.com Reporter Profile




Powered by WorldNow

ABCNews4 WCIV-TV

888 Allbritton Dr.
Mt. Pleasant, SC 29464
843-881-4444 | Advertising Information

Public Information File

For assistance with accessing WCIV-TV's public information file, click here.

Advertising

Advertising Credit Application and Terms and Conditions PDF.

Powered by WorldNow
All content Copyright © 2014 WCIV and Worldnow. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.