Charleston working to improve Colonial Lake - WCIV-TV | ABC News 4 - Charleston News, Sports, Weather

Charleston working to improve Colonial Lake

Posted: Updated:

CHARLESTON, S.C. (AP) - Charleston officials are working on a $4 million makeover of the 9.5-acre downtown lake that dates to Colonial times.

The Post and Courier of Charleston reports that plans for Colonial Lake include improving the water quality, rebuilding the seawalls and walking paths, adding flower beds and planting more than 90 trees.

Water quality is first on the list. The shallow, manmade lake has algae growth and low oxygen content.

City council last week approved seeking a $100,000 grant from a national nonprofit, which requires a $100,000 match.

The city plans to add a new flow line to a storm drain, allowing water to flow to and from the nearby Ashley River.

The increased circulation should keep the water level higher and carry away decades of muck and silt accumulation.

 

Information from: The Post and Courier, http://www.postandcourier.com

Copyright 2012 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Powered by WorldNow

ABCNews4 WCIV-TV

888 Allbritton Dr.
Mt. Pleasant, SC 29464
843-881-4444 | Advertising Information

Public Information File

For assistance with accessing WCIV-TV's public information file, click here.

Advertising

Advertising Credit Application and Terms and Conditions PDF.

Powered by WorldNow
All content Copyright © 2014 WCIV and Worldnow. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.